To view graphic version of this page, refresh this page (F5)

Skip to page body

Visitacion Valley/Schlage Lock Plan Workshops

alt=Visitacion Valley Schlage Lock Plan

 


Site & Vicinity Map (PDF)

Workshop Summaries

2002 Concept Plan (PDF)


Redevelopment Plan (PDF)

Design for Development Report (PDF)

Adopted Legislation


Summary of Public Workshops

The Planning Department, in association with the San Francisco Redevelopment Agency and an Urban Design Consultant, held five community workshops on the project. The Workshops focused on Developing alternative Framework Plans, Selecting a Preferred Urban Design Framework Plan, Urban Design issues, including building, streetscape and open space designs, Site Sustainability Features, and Design Guidelines for new development. Information on each of the workshops along with workshop materials can be viewed below.

 

Community Workshop Summary - August 4, 2007

On August 4th, 2007, the Planning Department held the fifth and final design workshop for the Vistacion Valley / Schlage Lock Master Plan. This workshop focused on design character and building form, with a special examination of building heights across the site per community request. Breakout activities focused on evaluation of design character, and specifically on the topics of buidling facades, retail design, roof design, and incorporation of sustainability. A summary of feedback received through this breakout activity is included here.


Public Comments & Summary of Open Space Design and Programming

Public comments - Acobat PDF 58 KB


Workshop Materials

Presentation - Acobat PDF 16.7 MB ( converted from PowerPoint )

 

 

Community Workshop Summary - May 5, 2007

On May 5th, 2007, the Planning Department held the fourth workshop for the Vistacion Valley / Schlage Lock Master Plan. This workshop focused on a sustainability strategy and framework for building green on the site, revisited previously discussed key elements including building heights, and provided a final overview of the vision for the site and the overall master plan developed over the course of the workshop series.


Public Comments & Summary of Open Space Design and Programming

Public comments - Acobat PDF 52 KB


Workshop Materials

Presentation - Acobat PDF 15.2 MB ( converted from PowerPoint )

 

 

Community Workshop Summary - January 6, 2007

On January 6th, 2007, the Planning Department held the third workshop for the Vistacion Valley / Schlage Lock Master Plan.


Public Comments & Summary of Open Space Design and Programming

Public comments - Acobat PDF 51 KB
Summary of Open Space Design and Programming - Neighborhood Park - Acobat PDF 3.1 MB
Summary of Open Space Design and Programming - Linear Park - Acobat PDF 4.8 MB
Summary of Open Space Design and Programming - Blanken Park - Acobat PDF 1.9 MB


Workshop Materials

Presentation - Acobat PDF 6.2 MB ( converted from PowerPoint )
Consolidated Framework and Building Design Views - Acobat PDF 11 MB

 

 

Community Workshop Summary - October 14, 2006

On October 14th, 2006, the Planning Department held the second workshop for the Vistacion Valley / Schlage Lock Master Plan.

Public comments - Acobat PDF 46 KB


Workshop Materials

Presentation - Acobat PDF 7 MB ( converted from PowerPoint )

Consolidated Framework Alternatives
Scheme 5 ( Greenway / Knuckle Park Modified ) - Acobat PDF 8.6 MB
Scheme 6 ( Leland Park Modified ) - Acobat PDF 8.5 MB

 

 

Community Workshop Summary - August 28, 2006

On August 28th, 2006, the Planning Department held the first workshop for the Vistacion Valley / Schlage Lock Master Plan.

Public comments - Acobat PDF 49 kB


Workshop Materials

Introduction Presentation - Powerpoint 35.5 MB
Alternatives Presentation - Powerpoint 30 MB
Framework Alternatives - Acobat PDF 12.5 MB

TopPlanning home

 
Last updated: 3/8/2010 4:19:51 PM